Jul 3, 2014 | Studio Notes
Day 5 – New Well Team Today we finished the drilling process and we placed the casing down the hole. Next we poured the filter gravel in the hole around the pvc casing, then concrete. Notice the halo around the sun, it was like a circular rainbow surrounding the...
Jul 2, 2014 | Studio Notes
Day 4 – New Well Team The New well team drilled to 195 ft! We started the day by using the 7″ reaming bit to make the whole large enough for the casing. While some of us were drilling the others were preparing the gravel for the natural stone filter. Its a...
Jul 1, 2014 | Studio Notes
Day 3 – Repair team Hey Guys, sorry I have been so brief on each post. I want to get some photos out for all those following our story however with sparse internet and a tired team we have been only doing bare minimum. I did finally however get the photos up...
Jun 30, 2014 | Studio Notes
Day 3 Today we split up into two teams. The new well team and the repair team. I, Jonathan, covered the new well team and this post will only have photos from that, I am just too tired to edit Caleb’s photos from the repair team tonight, so I will get them up...
Jun 29, 2014 | Studio Notes
Day 2 – Photos by Jonathan Ivy & Caleb Fleming This morning we left our first hotel and headed to church to have a Honduran Sunday service. We experienced the Holy Spirit in a way that most of us have never seen before. These people love the Lord and it...